The construction plan budget is the technical and economic documentation for the unit project, individual project, and construction project installation project cost determined after the construction drawing design is completed. The role of the construction drawing budget is mainly reflected in the following aspects:
1. The construction plan budget is the basis for bidding.
2. The construction drawing budget is the basis for the construction organization's organization of materials, equipment, equipment, and labor supply; it is the basis for the construction company's preparation of schedules and economic accounting; it is also the basis for the construction unit to formulate cost reduction measures and to compile the construction budget according to the calculation results of the quantity of work.
3. The construction drawing budget is the basis for the statistics of the completion of the workload of Party A and Party B, the settlement of the project, and the disbursement of the project payment.
4. The construction drawing budget is the basis for the engineering cost management department to supervise and inspect the implementation of the quota standard, reasonably determine the project cost, measure the cost index, and verify the tender project bid base.
The construction plan budget content and preparation basis
(1) Contents of the construction plan budget The construction plan budget includes the unit project budget, individual project budget, and construction project total budget. Summarizing the budgets of construction drawings of all units will become a single project construction plan budget; then summarizing the budgets of all individual project construction plans will become the total budget of the construction project. The unit project budget includes the construction project budget and equipment installation project budget.
(II) Basis for preparing the construction drawing budget
1. Construction drawings, brochures and standards atlas.
2. The current budget quota and unit valuation table, construction and installation project cost quota, project volume calculation rules. Corporate quotas are also the main basis for the preparation of construction drawings.
3. Construction organization design or construction plan, construction site survey and measurement data.
4. Material, labor, machinery budgets, project cost information, and dynamic price adjustment regulations. Moreover, under the conditions of market economy, in order to make the budget cost as close to reality as possible, all regional authorities have a clear regulation on this price.
5. Budget workbooks and related tools.
6. Project contracting agreement or bidding documents. It clarifies the project scope contracted by the construction unit and should bear the responsibilities, rights and obligations.
Decoration construction knowledge decoration budget knowledge price
Solid Carbide Drill With Internal Coolant
Features of stainless steel cutting:
Chips are not easy to break and are easy to bond: stainless steel has great plasticity and toughness. Chips are continuous during turning, which not only affects the smooth operation of the operation, but also crushes the processed surface.
When drilling stainless steel, the chips are easy to stick to the drills, that's need the coolant oil to flush out the chips from the holes.
Solid Carbide Drill With Internal Coolant,Carbide Drill Bit For Metal,Milling T Slot Cutter,Solid Carbide Drill Mill
ROYI CNC TOOL TAIXING CITY CO.,LTD , https://www.royitools.com