Before the wooden works are approached, the hydropower project will be implemented first. The main point of the first part is to confirm the location of the hydropower pipeline and the reserved height. The reserved height is usually set by the height of the lamp or the air-conditioning unit. This step is confirmed. After that, it will be able to reduce the subsequent remediation of the changes and avoid cost loss.
Fanmuju Solid Wood Furniture   Aishe Wallpaper
In the beautiful home space, the ceiling is also a part that can not be ignored. The wall can use a variety of materials to create a style, and in the ceiling part, whether it is a recent popular indirect lighting or a modelling ceiling design, it can be used. To wood! In the decorating process, the ceiling is usually also in the wooden work, the first part of the construction, this time for everyone to introduce the construction of wood ceilings, we must pay attention to matters.
Part I: Positioning of Hydroelectric Pipelines
Before the wooden works are approached, the hydropower project will be implemented first. The main point of the first part is to confirm the location of the hydropower pipeline and the reserved height. The reserved height is usually set by the height of the lamp or the air-conditioning unit. This step is confirmed. After that, it will be able to reduce the subsequent remediation of the changes and avoid cost loss.
Part II: The ceiling and the floor are indeed combined
The combination of wood-based ceilings is usually fixed with angles. In this section, it must be noted that the connection between the ceiling and floor slabs is indeed required. Without complete bonding, it can cause the ceiling to cave in or cracks.
Part III: Proper skeleton spacing is 34-38 cm
Before woodworking masters scrape off the material, they will use lasers to grasp the level and use 1.2-inch angle materials to construct the skeleton. In general, the space between 34-38 cm is the most appropriate.
Part IV: Reserve Repair Holes
It is envisaged that maintenance actions may be required in the future. When the work is performed, maintenance holes must be reserved in advance, and the appropriate size and size must be selected as reserved holes. This part is usually used in places where air-conditioning and drainage pipes are used, which can reduce future maintenance. The degree of difficulty.
Part V: Between the board and the board, reserved expansion joints
When the wooden ceiling is about to be completed, the surface of the slab is usually covered with a calcium silicate board. At this time, we must pay attention to the fact that there must be a 3-5mm gap between the plate and the board. It is used as a joint and paint filler.
Construction Acceptance Notice Lighting Brand Fabric Furniture Space Lighting Coating
Kitchen Shower,Kitchen Faucet,Brass Kitchen Faucet,Pull Down Kitchen Faucet
Yuyao Zelin Sanitary Ware Co., Ltd , https://www.zelinfaucets.com