How to Accept and Accept after Completion of Hydroelectric Reform

1. Water acceptance: After the water reformation is completed, the cold and hot water pipes have been reformed with a hose to ensure that the hot and cold water pipes of the entire indoor pipe are pressed at the same time; the pressure suppressor is installed, the pressure suppressor is filled with water, and the air in the pipe is let off, so that the entire circuit is inside. It is all water; close the water meter and the outside gate valve (make sure to protect it). Then began to suppress, the experimental value is 1.5 times the working pressure, 30 minutes impermeable, pressure drop does not exceed 0. 05MP is qualified

2. Strong power acceptance: Use 500V insulation resistance meter to test the insulation resistance value of each circuit, and at the same time, it can test the quality of the used wires. Wires that do not meet the standard may be broken down;

3. The weak current adopts the special tool test: The special network test tool tests whether the 8-core signal of the network is unimpeded; the carrier's copper shaft cable test tool, the multimeter and other complete tests are qualified before the next construction work.

Hydropower construction acceptance

Stainless Steel Bathroom Basket

Bathroom Basket,bathroom rack,bathroom holder,hanging basket,stainless steel basket,etc. Let your bathroom become more simple and upscale!Applicable to families, hotels, home stay and other places to use.

304 stainless steel never rust, will easy to clear, it's also very durable!

we are 13 year factory, we had big engineer team, and strong production line, can give you good serve and quanlity. Welcome to cooperation!

Bathroom Holder,Hanging Basket,Stainless Steel Wire Basket,Bathroom Wall Basket,Bathroom Hanging Basket

Shenzhen Lanejoy Technology Co.,LTD , https://www.szstainlesssteelwiremesh.com