The north wind shouted, suggesting that winter has arrived. Are you ready for the winter, and at this moment, are you planning on winter decoration?
Whether winter decoration design is a problem that many people are tangling. Then if the decoration, what are the things that need attention? Take the following take a look at the decoration you have to care about.
The decoration company workers are urged to open windows and change their air. If the owner goes to the site for inspection, it is better to open the window and ventilate as much as possible to complete the air exchange when the outdoor temperature is relatively suitable and the wind is not strong. If on-site construction workers are not ventilating their windows during the entire construction process because of fear of cold, they will certainly have a bad influence on the future of indoor air. For the decoration pictures that have already started construction or have just been completed, they must be protected. For example, if wood production projects are completed, it is necessary to use brushing primers for protection, so as to maximize the protection of wood moisture will not be lost. For walls that have been puttyed, it is best not to open doors and windows to avoid freezing or excessive drying. For those pavement tiles, it must not be possible to freeze ice at night.
Decide on the price of renovation. The owner always thinks that the quoted price is high, so he will desperately press down the price, but there is a degree to grasp. Once the pressure on the construction unit can not afford but very much want to take orders to make money, only rely on decoration materials to cut corners to solve the problem, and ultimately the victim is the victim of losses. Some of the more important concealed projects in the project leave many owners in no way. The price of the hidden project is generally determined by the owner and the decoration company according to the specific conditions of the construction. After construction, the principle of multiple return and less compensation can be implemented.
After the winter decoration design may encounter such a problem, then how to solve the following problems?
Decoration material decorative panel cracking
Solution: After the panel has been transported to the construction site, apply a dry towel to wipe off the dust and apply the brush twice to the back. All the decorative panels should be laid flat, with a large core board on the bottom and a large core board on the top, which cannot stand upright. This will prevent the panel from cracking and warping.
Decorating materials do not paint well
Solution: In the event of strong winds and cool weather, it is not appropriate to carry out oil work. Because large wind and sand in winter, paint and paint are not dry, it is easy to attach dust, should pay attention to choose the weather without wind to brush, ensure the temperature of the coating application of the environment Not less than 5 degrees Celsius, the ambient temperature when the varnish is applied is not less than 8 degrees Celsius, and should be applied strictly according to the temperature in the product description. Home decoration To prevent sand from falling on the paint surface, close the doors and windows.
Decoration material wooden deformation
Solution: The main materials used in the decoration, especially the wood, need to be placed in a room with heating equipment for three to five days to evaporate the moisture that is produced due to temperature changes. The interior decoration is done in such a way that the moisture content of the wood is close to the level in the house, so that wood deformation after the decoration is avoided.
Decoration decoration tiles fall off
Solution: Winter tiles and tiles must be soaked in water prior to pavement. Make sure the water is saturated. Only in this way, the phenomenon of hollowing and falling off will not occur due to the weak adhesion between cement and cement due to the suction water. In addition, no matter whether it is a wall tile or a floor tile, it must be transferred from the outdoor to the interior for 24 hours. The decoration company can lay it only when it adapts to the indoor temperature, so as to avoid emptying and falling off after construction; .
Decorative design wall cracking
Solution: Putty does not dry on the paint, the wall is easy to "sweat" or even a large area of ​​cracking phenomenon, indoor home renovation often open windows ventilation, the best time to choose between 10 am to 4 pm. The relatively high temperature during this period of time can prevent new batches of putty from freezing. After the putty was completely dry the first time, it was re-approved for the second time. After the second putty is completely dry, sand it carefully.
Entrance decoration study decoration decoration interior decoration window paint decoration decoration decoration company look good home picture decoration home tile price tile picture
Wall-Hung Toilet,swim jacuzzi,salt water swim spa,inground jacuzzi,hot tub and swim spa
Guangzhou Aijingsi Sanitary Products Co.,Ltd , https://www.infinityedgehottub.com