Home decoration quality verification standards (ground)

1. Wood floor: Unit: M*2 Process requirements: a. Remove ground floating ash, impurities, etc. Floor the floor with blockboard board, find the level, and glue the back-hook glue with cement nails to the ground. Substrate and four walls should leave 5~10mm seams. b wooden floor and surrounding walls ... 80 after a small husband and wife wedding ceremony petty bourgeoisie mood reflects a member of the exclusive cash discount · Mediterranean style blue + white mosaic even for the home art young hot mother 50,000 to create two Store No. 1 Cash Discount Coupon · Floor heating This winter is not afraid of cold · Small apartment mix new trend · 200,000 luxury to create 95 flat space · Dulux paint cost-effective big PK · TV wall small space big content

1. Wood floor: Unit: M*2 Process requirements: a. Remove ground floating ash, impurities, etc. Floor the floor with blockboard board, find the level, and glue the back-hook glue with cement nails to the ground. Substrate and four walls should leave 5~10mm seams. b Leave 10~12mm seams on the wooden floor and the surrounding wall and press it with the baseboard to avoid seams. c In the first floor, the wood floors should be treated with moisture-proof treatment, and the price is limited on this basis. (asphalt paper or linoleum). d The wooden floor is connected by staggered seams, and the back hanging white glue is nailed into the wood from the side obliquely with a gun nail. The nail head should not be exposed.
Quality requirements: 1. Firmly laid, no emptying, cracking, skew, twisting, spilled plastic, dirt marks. 2, wooden floor shop to deal with straight seams, tight patchwork, seam width between the board and the board should be 1 ~ 2mm. 3, the surface layer should be no significant scars, no obvious color, to achieve the above is qualified. 4. A new type of composite flooring is generally laid on a concrete floor with a foam cushion. (Cement floor can also be used as a blockboard substrate, the price is limited increase)

2, floor tiles: Unit: M * 2 Process requirements: a in the bathroom, the kitchen floor before the shop should clean up the original paste, playing hair. If the original waterproof layer is damaged, waterproof treatment should be repeated and a drowning test should be done. b. For rooms with slope requirements or floor drains, look for slopes in the direction of drainage. The slope is not less than 3%. c. Before paving the floor tile, the color number should be checked first, and should be soaked in water for at least 20 minutes. This method is only suitable for the use of special cement as the adhesive layer. d When using paving tiles, use cement paving and add 107 glue. Pay attention to the color number and pattern in the paving process. And see if there is any damage, then paste it and shoot it with a small wooden board. More than 4 hours after being posted, you can move around depending on the situation.
Quality requirements: 1. The surface of the surface layer is clean and free from discoloration and stains. The pattern is clear and the seams are even. The slope requirements should be met, and the pan-water must not be poured. The combination with the floor drain is tight and firm. 2, the type of floor tiles, specifications, color number, pattern should be consistent. The inlay must be firm and free from emptying (single empty corners of the board shall not exceed 5% of the total number of checks). There shall be no skew, no defects such as falling corners and cracks shall be qualified. Seams should be within the allowable range.

DELL floor nature floor cement space home room paint floor tile floor tile fashion small apartment bathroom waterproof bathroom waterproof price

Truss Head Self Driling Screw

Truss Head Self Driling Screw,Truss Washer Head Self Drilling Screw,Truss Head Self Drilling Screws,Truss Head Self Tapping Screws

Hebei Kangjin Metal Products CO.,Ltd , https://www.kjmetalproducts.com