Ten Processes to Be Paid Attention to in Construction of Home-installed Concealed Works

Many home improvement procedures, non-standard construction process is more likely to produce quality problems, so the hidden work in the home improvement construction "hidden engineering process must be very careful to avoid hidden dangers.

Process one: electrical circuit

In the home improvement process, the circuit transformation is indispensable, and the safety problems caused by the transformation are the most. A good circuit renovation program should not only pay attention to external effects but also take into account safety factors, as well as the convenience of future maintenance, and advance the 20-year plan of the line on the basis of economical guarantee. At the same time, in the actual construction, it is necessary to adjust the circuit capacity, deal with the interference between strong and weak electricity, and the slotting and trending of fractional-route pipelines are all process nodes that need attention.

Process II: Up and down the water pipeline

Cold water, sloppy, hot and cold water is not hot, if the water goes thin, the drainage is not blocked... These things are already a lot of headaches, let alone a big event like “Shuishan Jinshan”. Putting an end to flooding is only the basic requirement that the project quality should meet. A more reasonable arrangement is to further consider how to reduce the resistance of water in the transportation process, how to configure the indoor hot water source in an energy-saving house, and how to combine water supply with heating. And so on.

Process 3: Gas pipeline

According to the regulations, the gas meter is strictly prohibited from moving, and the gas pipeline is not allowed to be a concealed pipe. However, many people still move the gas meter for aesthetic reasons or wrap the gas pipe. As the highest risk factor in the house, the installation of the gas pipeline must comply with regulations, but for modern people, the decoration effect will not be. According to reports, there will be not only the anatomy of various aspects of gas pipeline installation, but also examples of various decorative effects.

Process 4: Wall Treatment

The wall is the face of the house. Why do many houses have cracks within six months? In fact, the key lies in the processing of the substrate. There are many details. If you do not handle it properly, it will affect the final surface effects. For example, special protective measures should be taken for the corners that can easily be damaged.

Process 5: paint painting

Compared with other projects in the renovation, the technical content of the brushing project is indeed relatively low, but the brushing project is not as simple as “trimming the paint on the wall with the brush.” Improper operation will result in whitening and coloration. Spots, wrinkles, sagging and other defects.

Process VI: The installation of the keel to the installation of the keel is related to the quality of the flooring. If the ground keel is not well laid, then how to carefully lay the floor, deformation, instability, noise when walking or other issues will still appear. The exhibition will show new techniques such as the "lay-free keel-laying method", which can greatly reduce the occurrence of such problems.

Process 7: Laying of Wall Tiles

Stone floor decoration is generally used in the stone, however, these expensive materials are often not as solid as their name sounds. How to operate properly in the laying process so as to achieve the purpose of being both firm, beautiful and material-saving, and how to choose a reasonable laying method to extend the service life of the wall and floor tiles. These problems must be clearly understood.

Process 8: floor laying

The floor is the bulk of the renovation costs, and the floor is most likely to cause quality disputes. Floors made of different tree types and different techniques have slight differences in laying. It requires a scientific installation method. In fact, flooring and wall tiles seem to be superficial, but what really determines the quality of their lay lies in the invisible primary treatment.

Process 9: ceiling installation

People tend to care only about the aesthetics of smallpox and ignore the security at the top. If the combination of the ceiling and the floor slab and the keel and veneer is not done well, the ceiling is like a sword hanging over the head of the family, and there is always the possibility of an accident. Process 10: Wood Products Processing

Process 10: Wood Products Processing

The processing of wood products, especially the floor coverings, is also important. In addition to strictly complying with the process requirements, and never evading the process, it is also necessary to flexibly grasp the influencing factors such as temperature and humidity at the site.

Hidden project decoration home improvement heating paint residential floor tiles

Baking cooling rack

Baking rack,baking cooling mesh,baking Cooling Rack,cooling rack, steel wire cooling rack, etc.

Baking wire mesh is made of high quality 304 stainless steel, never rusting and durable. Cooling Wire mesh does not have any coating or chemical ingredients, making food safer.

Multi-functional Grill Cooking rack: the wire mesh is mainly used for outdoor cooking, it can also be used as a cooling and baking rack. Or you can develop other uses for it.

Cooling Rack,Barbecue Wire Mesh,Barbecue Mesh Grill,Bbq Mesh,Bbq Grill Metal Mesh

Shenzhen Lanejoy Technology Co.,LTD , https://www.grill-grid.com